Jiangsu Profile

Product List
25951. Transformers with Advanced Bushing & Winding Design for Enhanced Reliability
[Mar 11, 2026]
[Mar 11, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
25952. Weatherproof Steel Kiosk 12kv 500-2000kVA IP55 UV Resistant Outdoor Substation Transformer Use
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25953. All-in-One Electrical Kiosk 36kv 1600kVA Pre-Assembled Minimal Site Work Substation Transformer
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25954. Mining Industry Power Unit 33kv 3150kVA Reinforced & Ventilated Design Substation Transformer
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25955. High-Voltage/Low-Voltage 2/0.4kv Mobile Outdoor Prefabricated Transformer Substation 10/15/20K
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25956. Evironmental Prefabricated Distribution Box Variation Box-Type Transformer Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25957. IEC CE Standard 500kVA 33kv to 0.4kv Compact Transformer Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25958. 11kv 15kv 33kv 33kv 400-2000kVA Export-Type European-Style Outdoor High High-Quality Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25959. Electric Utility Standard Cdss 800kVA 15kv 33kv to 0.4kv Compact Substation Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25960. Outdoor Wind Power Step up 10/13/20/33/40kv 200/630/1000/2500/7250kVA Prefabricated Oil Immersed ...
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25961. 200 kVA 160 kVA Solar Compact Substation Prefabricated Electrical Substation Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25962. 250kVA 800kVA 1250kVA Box Type Pad-Mounted Transformer Power Combined Compact Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25963. CE IEC Standard Eeu 1250kVA 15kv 33kv to 0.4kv Compact Transformer Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25964. 100-800kVA Export-Type European-Style Outdoor High-Voltage Box-Type Substation Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25965. 15kv630/800/1000kVA Box-Type Transformer Substations for New Energy Generation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.



















