Jiangsu Profile

Product List
25936. Hot Sale Electric Pq Series Core Flyback Switching Transformer Pq3535
[Jul 21, 2022]
[Jul 21, 2022] Product Description The magnetic core of the PQ type high frequency transformer is a ferrite core which designed to meet the requirements of the new switching power supply. Its switch can meet the requirements of ...
25937. PCB Electrical Resin Potting Low Power Consumption Ei30 Core Encapsulated Power Transformer
[Jul 21, 2022]
[Jul 21, 2022] Product Description EI potting transformer is designed and manufactured with high-quality silicon steel sheet with low power consumption, which has the characteristics of small no-load loss, high efficiency and low ...
25938. Transformers with Advanced Bushing & Winding Design for Enhanced Reliability
[Mar 11, 2026]
[Mar 11, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
25939. Weatherproof Steel Kiosk 12kv 500-2000kVA IP55 UV Resistant Outdoor Substation Transformer Use
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25940. All-in-One Electrical Kiosk 36kv 1600kVA Pre-Assembled Minimal Site Work Substation Transformer
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25941. Mining Industry Power Unit 33kv 3150kVA Reinforced & Ventilated Design Substation Transformer
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25942. High-Voltage/Low-Voltage 2/0.4kv Mobile Outdoor Prefabricated Transformer Substation 10/15/20K
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25943. Evironmental Prefabricated Distribution Box Variation Box-Type Transformer Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25944. IEC CE Standard 500kVA 33kv to 0.4kv Compact Transformer Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25945. 11kv 15kv 33kv 33kv 400-2000kVA Export-Type European-Style Outdoor High High-Quality Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25946. Electric Utility Standard Cdss 800kVA 15kv 33kv to 0.4kv Compact Substation Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25947. Outdoor Wind Power Step up 10/13/20/33/40kv 200/630/1000/2500/7250kVA Prefabricated Oil Immersed ...
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25948. 200 kVA 160 kVA Solar Compact Substation Prefabricated Electrical Substation Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25949. 250kVA 800kVA 1250kVA Box Type Pad-Mounted Transformer Power Combined Compact Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
25950. CE IEC Standard Eeu 1250kVA 15kv 33kv to 0.4kv Compact Transformer Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.



















