Jiangsu Profile

Product List
54031. Steel Table Formwork
[Nov 04, 2025]
[Nov 04, 2025] Product Description Steel frame formwork Steel frame formwork is made up of 18mm OR 15mm thick plywood covered with hollow steel. It is a complete product system with many types, such as wall formwork, column ...
54032. Steel Ringlock Scaffolding Scaffold Steps System Frame Set
[Aug 25, 2025]
[Aug 25, 2025] Steel Ringlock Scaffolding Scaffold Steps System Frame Set Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Material Standard Q345, Q235 Carbon steel Size of ...
54033. Micro Mobile House Two Bedroom Portable Living Container House 20FT Scalable High Quality Modular ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54034. Micro Folding Container Houses Are Used for Fast Assembly of Prefabricated Houses and Modular ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54035. High Quality Ready-Made Portable Folding Houses, Complete Set of Bedrooms, Container Houses, 20FT, ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54036. Grande Prefab Housing Container Foldable Container House Customized Fast Assemble Container Tiny ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54037. China Direct Factory Public Low Cost Cabin Toilet Mobile Toilet Outdoor Portable Toilet ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54038. China Specializes in Toilet Portable Toilet to Create a Chemical Portable Toilet with a Portable ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54039. Lianggong Aluminium Panel Formwork Plywood Frame Formwork for Use in Building Construction
[Nov 03, 2025]
[Nov 03, 2025] Product Description Aluminum Frame formwork The aluminum-framed panel system is ideal for vertical construction, and small, medium to large jobs. With various standard panel sizes, assembling and disassembling can be ...
54040. Lianggong Manufacturer Steel Formwork Precast Concrete Molds for Sale, Film Faced Plywood Poplar ...
[Nov 04, 2025]
[Nov 04, 2025] Product Description Steel Frame Formwork Steel frame formwork consists of steel frame and plywood.After the system is assembled,a whole frame is formed,which has good stability and high bearing capacity.Several ...
54041. Core Feature and Practical Performance H20 Timber Beam Formwork for Flex Slab Concrete Construction
[Sep 03, 2025]
[Sep 03, 2025] H20 Timber Beam Formwork System H20 Timber Beam Formwork includes steel walers, H20 timber beams, and other connecting components. Depending on the length of the H20 beam, which can be up to 6.0 m, these components can ...
54042. China Popular Steel Metal Formwork for Concrete Construction
[Jun 24, 2025]
[Jun 24, 2025] China Popular Steel Metal Formwork for Concrete Construction Product Description Steel Formwork Steel formwork is strong and durable, therefore can be reused many times in construction. It is easy to assemble and ...
54043. China Manufacture Customized Simple Installation Plastic Formwork for Concrete Construction
[Oct 31, 2025]
[Oct 31, 2025] Product Description Plastic Formwork Brief Introduction Plastic Formwork is a new material formwork system made from ABS and fiber glass. It can produce round columns with 1500 x 2400 950 x 2400 600 x 2400 ...
54044. Lianggong Reusable Steel Formwork Trench Box, Trench Shoring, Trench Shields for Ditch China ...
[Nov 12, 2025]
[Nov 12, 2025] Product Description Lightweight Trench Box Trench boxes are used in trench shoring as a form of trench ground support. They offer an affordable lightweight trench lining system. They are most commonly used for ...
54045. Top 10 Scaffold Toeboard for Construction Scaffold Planks Andamios Ledgers with Logo Scaffold ...
[Sep 01, 2025]
[Sep 01, 2025] Scaffolding Price Metal Scaffolding Layher System scaffolding Ringlock Scaffolding System Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Material Standard Q345, Q235 Carbon steel Size of ...



















