Jiangsu Profile

Product List
54001. Lianggong Manufacture Concrete Metal Q235/355 Steel Formwork for Building Construction
[Jul 17, 2025]
[Jul 17, 2025] Lianggong Manufacture Concrete Q235/355 Steel Formwork System for Wall Column Construction Product Description Steel Formwork System Our company can design and manufacture various specifications of steel formwork ...
54002. Prefabricated Guest House Hotel Design Tiny Easy to Build Container House Structure Flat Pack ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54003. Portable Outdoor Toilet Made of HDPE Plastic with Foot Operated Pumps and and Big Waste Container ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54004. Plastic Construction Moulding for Bricks Construction
[Oct 31, 2025]
[Oct 31, 2025] Product Description Plastic Formwork * Plastic Formwork for Concrete made from plastic thus can be handled by manual; * It leaves no blemishes or discoloring on the concrete; * Save budget a great deal compared ...
54005. Steel Table Formwork
[Nov 04, 2025]
[Nov 04, 2025] Product Description Steel frame formwork Steel frame formwork is made up of 18mm OR 15mm thick plywood covered with hollow steel. It is a complete product system with many types, such as wall formwork, column ...
54006. Steel Ringlock Scaffolding Scaffold Steps System Frame Set
[Aug 25, 2025]
[Aug 25, 2025] Steel Ringlock Scaffolding Scaffold Steps System Frame Set Product Description Brand Name Rapid Place of Origin Wuxi, Jiangsu, China Material Standard Q345, Q235 Carbon steel Size of ...
54007. Micro Mobile House Two Bedroom Portable Living Container House 20FT Scalable High Quality Modular ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54008. Micro Folding Container Houses Are Used for Fast Assembly of Prefabricated Houses and Modular ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54009. High Quality Ready-Made Portable Folding Houses, Complete Set of Bedrooms, Container Houses, 20FT, ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54010. Grande Prefab Housing Container Foldable Container House Customized Fast Assemble Container Tiny ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54011. China Direct Factory Public Low Cost Cabin Toilet Mobile Toilet Outdoor Portable Toilet ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54012. China Specializes in Toilet Portable Toilet to Create a Chemical Portable Toilet with a Portable ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
54013. Lianggong Aluminium Panel Formwork Plywood Frame Formwork for Use in Building Construction
[Nov 03, 2025]
[Nov 03, 2025] Product Description Aluminum Frame formwork The aluminum-framed panel system is ideal for vertical construction, and small, medium to large jobs. With various standard panel sizes, assembling and disassembling can be ...
54014. Lianggong Manufacturer Steel Formwork Precast Concrete Molds for Sale, Film Faced Plywood Poplar ...
[Nov 04, 2025]
[Nov 04, 2025] Product Description Steel Frame Formwork Steel frame formwork consists of steel frame and plywood.After the system is assembled,a whole frame is formed,which has good stability and high bearing capacity.Several ...
54015. Core Feature and Practical Performance H20 Timber Beam Formwork for Flex Slab Concrete Construction
[Sep 03, 2025]
[Sep 03, 2025] H20 Timber Beam Formwork System H20 Timber Beam Formwork includes steel walers, H20 timber beams, and other connecting components. Depending on the length of the H20 beam, which can be up to 6.0 m, these components can ...



















