Jiangsu Profile

Product List
5536. 20 Feet 40 Feet Luxury Homes Prefab Flat Pack Container House for Living Container House
[Jul 08, 2025]
[Jul 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5537. 20FT 40FT Camp Prefab Capsule House Ready to Ship Hot Selling Highend Customized Prefab Modular ...
[Jul 07, 2025]
[Jul 07, 2025] Product Description No Description Configuration 1 Main body frame system Seismic steel structure 2 Door and window system Aluminium alloy 3 Thermal insulation system Polyurethane foam 100 mm 4 Exterior ...
Company: Hig Housing Tech Co., Ltd.
5538. Customized Movable Integrated Prefabricated Event Park Camping Bathroom Washroom Latrine Toilet ...
[Apr 30, 2025]
[Apr 30, 2025] Product Description Item Specification Material EPS color steel composite board Style Squat /Sitting toilet Specification 1100*1100*2300mm Inner size 970*970*1900mm Featuies Strong and durable / Easy to assemble ...
5539. Wholesale Price Industrial Tubular Immersion Electric DC 48V 24V 12V Water Heater Resistance
[Mar 06, 2025]
[Mar 06, 2025] Product Description The heating pipe adopts stainless steel tube coat, modified magnesium oxide powder, high-performance nickel-chromium electrothermal alloy wire and other materials. This series of products can be ...
Company: Taizhou Kayson Electric Heating Technology Co., Ltd.
5540. 6kw 3 Phase 220V 380V Oil Electric Tubular Heating Element Water Immersion Heater Industrial ...
[Mar 06, 2025]
[Mar 06, 2025] Product Description The heating pipe adopts stainless steel tube coat, modified magnesium oxide powder, high-performance nickel-chromium electrothermal alloy wire and other materials. This series of products can be ...
Company: Taizhou Kayson Electric Heating Technology Co., Ltd.
5541. 12V 100 Watt DC Stainless Steel Industrial Electric Immersion Tubular Water Heating Element
[Mar 06, 2025]
[Mar 06, 2025] Product Description The heating pipe adopts stainless steel tube coat, modified magnesium oxide powder, high-performance nickel-chromium electrothermal alloy wire and other materials. This series of products can be ...
Company: Taizhou Kayson Electric Heating Technology Co., Ltd.
5542. 20FT Modular Vessel House Apple Cabin House Ready to Live Easy Installation Luxury Configuration ...
[Jul 11, 2025]
[Jul 11, 2025] Product Description No Description Configuration 1 Main body frame system Seismic steel structure 2 Door and window system Aluminium alloy 3 Thermal insulation system Polyurethane foam 100 mm 4 Exterior ...
Company: Hig Housing Tech Co., Ltd.
5543. Manual Automatic Saw Blade Cutter Grind Sharpening Machine Alloy Steel Round Circular Sharpener ...
[Jul 10, 2025]
[Jul 10, 2025] Product Description Circular saw sharpener machine 1. The machine is mainly driven by cam mechanism with stable performance. The main components are casted to suppress vibration during operation. 2. Adopt rack ...
5544. Highend Customized Modular Prefabricated House Luxury Modular Outdoor Camp Prefab Capsule House ...
[Jul 09, 2025]
[Jul 09, 2025] Product Description No Description Configuration 1 Main body frame system Seismic steel structure 2 Door and window system Aluminium alloy 3 Thermal insulation system Polyurethane foam 100 mm 4 Exterior ...
Company: Hig Housing Tech Co., Ltd.
5545. 100-1500kg/H Waste Wood Pallet Shredder Machine Wood Chipper Crusher Machine
[May 20, 2025]
[May 20, 2025] 100-1500kg/h Waste Wood Pallet Shredder Machine Wood Chipper Crusher Machine Application: Pallet chipper is used for recycling disposal of wood pallets, wood boards, wood sheets, wood bricks, tree branches, and ...
Company: Wanrooe Machinery Co., Ltd.
5546. Extendable Cabin Free 3 Bedroom Bungalow Plan Design Wooden Floor Mobile House
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5547. Ready Made Container-House-Thailand Two Story Duplex Expandable Container House
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5548. Foldable House Set Sunny Living Pre Fabricated Prefab Expandable Container Office
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5549. Modular Shipping in Nepal Luxury 2 Bedroom Plan Expandable Container House
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
5550. Foldable Garden Wooden Portable House Office with Bathroom Prefab Home
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.



















