Jiangsu Profile

Product List
1561. Adjustable Electrical Pipe Clamp
[May 14, 2026]
[May 14, 2026] Tray, ladder rack width (W) Allowable minimum sheet thickness Steel cable tray FRP cable tray Aluminum alloy cable tray W≤150 1.0 3.0 1.2 150<W≤300 1.2 3.5 1.5 300<W≤500 1.5 4.0 2.0 500<W≤800 2.0 4.5 2.2 W>800 2.2 5.0 ...
Company: RH Group of Companies
1562. Galvanized Steel Instrument Tube Clip
[May 14, 2026]
[May 14, 2026] Tray, ladder rack width (W) Allowable minimum sheet thickness Steel cable tray FRP cable tray Aluminum alloy cable tray W≤150 1.0 3.0 1.2 150<W≤300 1.2 3.5 1.5 300<W≤500 1.5 4.0 2.0 500<W≤800 2.0 4.5 2.2 W>800 2.2 5.0 ...
Company: RH Group of Companies
1563. Instrumentation Pipe Row Clamp
[May 13, 2026]
[May 13, 2026] Tray, ladder rack width (W) Allowable minimum sheet thickness Steel cable tray FRP cable tray Aluminum alloy cable tray W≤150 1.0 3.0 1.2 150<W≤300 1.2 3.5 1.5 300<W≤500 1.5 4.0 2.0 500<W≤800 2.0 4.5 2.2 W>800 2.2 5.0 ...
Company: RH Group of Companies
1564. Adjustable Bk Cable Clip
[May 12, 2026]
[May 12, 2026] Tray, ladder rack width (W) Allowable minimum sheet thickness Steel cable tray FRP cable tray Aluminum alloy cable tray W≤150 1.0 3.0 1.2 150<W≤300 1.2 3.5 1.5 300<W≤500 1.5 4.0 2.0 500<W≤800 2.0 4.5 2.2 W>800 2.2 5.0 ...
Company: RH Group of Companies
1565. Oil Immersed Single Phase Pole Mounted Transformer with UL Certificate Transformer
[Apr 07, 2026]
[Apr 07, 2026] A single-phase pole mounted transformer is a special type of single-phase transformer that has a pole mounted shape. It consists of a primary winding and a secondary winding and is primarily used to step up or step ...
Company: Jiangsu Daelim Electric Co., Ltd.
1566. 20kv 10.5kv 5000kVA Heavy Duty Oil Immersed Distribution Transformer CE Certified
[Apr 07, 2026]
[Apr 07, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
1567. 22/0.4kv 3150kVA High Voltage Power Distribution Transformer Factory Price Utilities Renewable
[Apr 07, 2026]
[Apr 07, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
1568. 33kv 2500kVA Oil Type Distribution Transformer for Energy Transmission Lines
[Apr 07, 2026]
[Apr 07, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
1569. Pad-Mounted Prefabricated Substation 15kv/25kv, 750kVA for Utility & City Distribution
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
1570. Compact Substation for Data Center 10kv/20kv 1600-2500kVA N+1 Redundancy Option
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
1571. 630kVA IEC Standard 12kv 3000kVA Compact Prefabricated Transformer Mobile Substation
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
1572. Compact Substation for Solar Farm 24kv/0.4kv, 1600kVA Pad-Mounted IP54, IEC Certified
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
1573. Modular Compact Substation 12kv 1000kVA Hv LV & Transformer in One Compact Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
1574. Transformer Substation Kiosk with PLC Control 15kv 1000kVA Automated & Remotely Operated
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
1575. Outdoor Substation Transformer Kiosk 11kv/0.415kv 750kVA Complete Mv/LV Distribution Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.



















