Jiangsu Profile

Product List
50191. 1000kVA 2500kVA 3500kVA 5000kVA Three Phase Europe Prefabricated Substation Manufacturers
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50192. 250kVA IEC60076 Standard 1250kVA Primary and Secondary Compact Prefabricated Substation Australia
[Jan 27, 2026]
[Jan 27, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50193. 12/ 100-800kVA Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50194. 15kv to 400V 1250kVA Prefabricated Substation with Oil Immersed Distribution Transformer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50195. Transformer European Box-Type Transformer Substation E-House Ybm-12/0.4 /100kVA Prefabricated ...
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50196. 1000kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations ...
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50197. 100-800kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations ...
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50198. 800kVA 11kv 400V Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50199. Effective 3500 kVA Green Power Transmission Transformer Mobile Box-Type Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50200. 800kVA 1000kVA Transformer Substation Pad Mounted Substation
[Jan 15, 2026]
[Jan 15, 2026] Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...
Company: Jiangsu Daelim Electric Co., Ltd.
50201. 275 Kv 500 Mva IEC-Certified High Voltage Power Transformer on-Load Tap Changer
[Oct 29, 2025]
[Oct 29, 2025] 1. CertificationsDaelim is a professional transformer manufacturer and supplier. Various international standards can be customized for your transformer, such as: IEEE/ANSI, AS/NZS, IEC, EN 60076, GOST, etc.Daelim ...
Company: Jiangsu Daelim Electric Co., Ltd.
50202. 450 kVA 500 kVA 630 kVA Distribution Transformer 11/0.4 Kv 11/0.415 Kv
[Oct 29, 2025]
[Oct 29, 2025] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.
50203. Compact Transformer Station 15/0.4 Kv 250 kVA 400 kVA 630 kVA
[Oct 27, 2025]
[Oct 27, 2025] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.
50204. 800 kVA 1000 kVA 1250 kVA Transformer Substation Skid Mounted Design
[Oct 27, 2025]
[Oct 27, 2025] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.
50205. 250 kVA 300 kVA 400 kVA Substation Transformer Compact Package Unit
[Oct 27, 2025]
[Oct 27, 2025] Daelim Belefic three-phase oil-immersed small substation transformer is designed to use in the power distribution system.A substation is a component of a system that generates,transmits, and distributes ...
Company: Jiangsu Daelim Electric Co., Ltd.



















