Jiangsu Profile

Product List
10396. 40FT Luxury House Cheap Container House Steel Structure Prefabricated Expandable House Container ...
[May 08, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
10397. Paint Brush Kit, Paint Roller Kit, Paint Tray Kit, Sturdy Paint Tray
[May 07, 2025]

· Include 1 x paint stirring 1 x spatula 1 x carpenter's pencil 1 x plug-in bracket 1 x masking film 1 x plug-in bracket 1 x paint tray 4 x paint roller 1 x ring brush 1 x masking tape 1 x utility ...
Company: Jiangsu B-Line Tools Co., Ltd.
10398. IEC 62133-2 Forced Internal Short-Circuit Isc Tester
[May 04, 2025]

Battery Test Equipment Forced Internal Short-Circuit Isc Tester IEC62133-2 Applicable Standards JISC 8714:2007,IEC62133-2017 Application This is a specialized equipment used to performing the forced ...
Company: Wuxi Serve Real Technology Co., Ltd.
10399. Ceeg High Voltage 3 Phase 10kv 35kv 66kv 110kv 220 Kv 1000kVA 1800kVA 5000kVA 40 Mva Variable ...
[Apr 22, 2025]

Product Parameters S11-50-75000/35 Off-excitation voltage regulating transformer technical parameters Rated Capacity kVA Voltage combination and tap range Vector Group Load loss kW load loss kW(75C) No-load ...
Company: CEEG Transformer Co., Ltd
10400. Ceeg Three-Phase Supply Power Transformer Manufacturers 110 Kv 115kv 120 Mva 80mva Oil Immersed ...
[Apr 22, 2025]

Product Parameters Performance parameters of S20-6300~180000/110kV oil-immersed three-phase double-winding non-excitation voltage regulating power transformer (secondary energy efficiency) Rated ...
Company: CEEG Transformer Co., Ltd
10401. 5000 kVA 1mva 35kv Oil Immersed Power Transformer Three Phase Oil Immersed Transformer Power ...
[Apr 22, 2025]

Product Description Product Parameters SZ20-3150~31500/35 On-load tap changer oil-immersed transformer technical parameters (secondary energy efficiency) Rated Capacity kVA Voltage combination and tap ...
Company: CEEG Transformer Co., Ltd
10402. Sb11-3500 Oil-Immersed Power Transformer
[Apr 22, 2025]

\ BRIEF INTRODUCTION \ Favorable to meet the power peak demands of summer, CEEG's oil-immersed power transformers are suitable for distribution networks with high load rates under high temperatures and places with ...
Company: CEEG Transformer Co., Ltd
10403. Ceeg Customized 35kv 66kv 110kv 220kv Mv Hv Transformers 63 Mva Transformer Manufacturer to ...
[Apr 22, 2025]

Product Parameters S11-50-75000/35 Off-excitation voltage regulating transformer technical parameters Rated Capacity kVA Voltage combination and tap range Vector Group Load loss kW load loss kW(75C) No-load ...
Company: CEEG Transformer Co., Ltd
10404. Ceeg 80 Mva Power Transformer Oil Immersed 220kv Variable Voltage Transformer Three Phases Input ...
[Apr 22, 2025]

Product Parameters S11-50-75000/35 Off-excitation voltage regulating transformer technical parameters Rated Capacity kVA Voltage combination and tap range Vector Group Load loss kW load loss kW(75C) No-load ...
Company: CEEG Transformer Co., Ltd
10405. Ceeg Customized 1000kVA to 75000 kVA 33/0.4kv Power Distribution Transformer Available for ...
[Apr 22, 2025]

Product Parameters S11-50-75000/35 Off-excitation voltage regulating transformer technical parameters Rated Capacity kVA Voltage combination and tap range Vector Group Load loss kW load loss ...
Company: CEEG Transformer Co., Ltd
10406. Ceeg 35kv 66kv Oil Immersed Power Transformer 3150 3000 6300 kVA 10000kVA 24000kVA 25000 kVA ...
[Apr 22, 2025]

Product Parameters S11-50-75000/35 Off-excitation voltage regulating transformer technical parameters Rated Capacity kVA Voltage combination and tap range Vector Group Load loss kW load loss ...
Company: CEEG Transformer Co., Ltd
10407. Low Price Light Steel 20 Foot Flat Packaging Container House, Prefabricated Camping House, ...
[Apr 15, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
10408. Factory 10 Feet 20 Feet 40 Feet Prefabricated Steel Flat Packaging Container House Open Detachable ...
[Apr 15, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
10409. Customized Manufacturers Supply Rock Wool Color Steel Plate Container Houses, Mobile Houses, Office ...
[Apr 15, 2025]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
10410. 3 in 1 Laser Distance Meter with Measuring Tape Rangefinder Laser Tape Measure
[Mar 21, 2025]

Product Name: 3-in-1 Laser Tape Meter Tape Measuring Range: 5 Meters Tape Size: Wide:19mm,Thickness:0.12mm,Length: 5m Tape Accuracy: ±1.5mm Laser Measuring Range: 40 Meter Laser ...
Company: Huaian Pango Machinery Co., Ltd.
