Jiangsu Profile

Famous Export Brand

Product List
8911. Premium Durable Fitness Gear for Modern Sports Facilities
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Structural Characteristics • Large-span Space: The high strength of steel allows for large spans, meeting the need for open spaces in stadiums. For example, the Bai Lu Stadium of Xiamen Olympic ...
8912. High-Quality Steel Structure Workshop Buildings for Global Distribution
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
8913. Durable Steel Workshop Solutions for Maximum Productivity and Longevity
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than concrete structures. A ...
8914. Premium Steel Workshop Buildings for Lasting Durability and Performance
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, rapid commissioning Short build period: Factory prefabrication and on-site assembly, 30%-50% faster than concrete. A 300m2 factory can ...
8915. Innovative Prefab House Solutions with Robust Steel Beams
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, rapid commissioning Short build time: Factory prefabrication and on-site assembly is 30%-50% quicker than concrete. A 300m2 factory can ...
8916. Durable Steel Building Materials for Green Energy Factories
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Prefabrication and on-site assembly are 30%-50% faster than concrete. A 300m2 factory can ...
8917. Durable Steel Structure Workshops for Streamlined Manufacturing Solutions
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
8918. Durable Steel Workshop Buildings Designed for Heavy-Duty Use
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Prefabrication and assembly, 30%-50% faster than concrete. A 300m2 building can be done ...
8919. Premium Stainless Steel Designs for Enduring Strength and Durability
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short period: Factory prefabrication and assembly, 30%-50% faster than concrete structures. 300m2 can be done by 5 ...
8920. Premium Steel Solutions for Eco-Friendly Industrial Construction Needs
[Jun 30, 2026]
[Jun 30, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High efficiency, quick commissioning Short period: Factory prefabrication and on-site assembly, 30%-50% faster than concrete structures. A 300m2 factory building can ...
8921. Versatile Steel Structure Workshop for Industrial and Commercial Use
[Jun 26, 2026]
[Jun 26, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Short construction period: Factory prefabrication and on-site assembly, 30%-50% faster than traditional concrete ...
8922. Versatile Structures with Durable Insulated Wall Panels for Efficiency
[Jun 23, 2026]
[Jun 23, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. Efficient construction, rapid commissioning Fast build: Prefab onsite, 30%-50% quicker than concrete. 300m2 factory by 5 workers in 30 days. Weather-resistant: ...
8923. Insulated Steel Building Materials for Versatile Factory Structures
[Jun 23, 2026]
[Jun 23, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, rapid setup Fast build: Prefabrication onsite, 30%-50% faster than concrete. 300m2 factory by 5 workers in 30 days. Weather-resistant: ...
8924. High-Quality Insulated Roofs for Efficient Insulated Steel Buildings
[Jun 23, 2026]
[Jun 23, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. Efficient construction, rapid commissioning Fast build: Prefab onsite, 30%-50% faster than concrete. 300m2 by 5 workers in 30 days. Weather-resistant: Build in rain ...
8925. Pipe Sliding Support for The Thermal Pipe Installation Q235B Pipe Sliding Base
[Apr 27, 2026]
[Apr 27, 2026] Pipe slide connector HOHD Application For DN100 heat pipe installation Technical data Material: Q235B Surface treatment: Zinc galvanized/hot dip galvanized/zinc chrome coating Product features Hanging and support two ...



















