Jiangsu Profile

Product List
8431. Steel Structure Fabrication Bogies Wheels
[Feb 19, 2025]
[Feb 19, 2025] WUXI TAICHEN MACHINERY & EQUIPMENT CO., LTD. 11-12/FL JINHE BLDG 1008 JIEFANGDONG ROAD,WUXI P.R. CHINA As a precision manufacturer of a wide range of metal parts and components, Our certified welders and skilled ...
8432. Steel Structure Fabrication Dry Bottom Feed System Top Hopper
[Jan 13, 2025]
[Jan 13, 2025] CHINA MACHINERY ENGINEERING WUXI CO.,LTD. 11-12/FL JINHE BLDG 1008 JIEFANGDONG ROAD,WUXI P.R. CHINA As a precision manufacturer of a wide range of metal parts and components, Our certified welders and skilled ...
8433. Checkerboard Pattern Supplier Selling Aluminum Alloy Plate for Sale
[Oct 12, 2024]
[Oct 12, 2024] What we do? Product Description Our selection of aluminium checker plates is ideal for a number of applications in many industries, ranging from food processing to manufacturing vehicles and marine ...
8434. Manufacturer Container House Project, Modular Container House for Dormitory Building
[Sep 15, 2023]
[Sep 15, 2023] Connected container house building, popular container house with toilet, air conditioner container house Size: L6055*W2435*H2800mm 1. Structure: Be made of hot galvanized light steel frame with sandwich panels ...
Company: CS Modular House Co.,Ltd.
8435. Steel C Channel for Steel Structure Frame Building Construction
[Apr 10, 2018]
[Apr 10, 2018] Description of stainless steel u channel price Material Carbon steel or SS304 or SS316 Surface Treatment HDG(hot dipped galvanized ),Pre-galvanized,Electrical-galvanizing(yellow or white),powder ...
8436. Bolt Assembled Safe Cage Ladder for Building Exterior with CE Mechanical Safety Approval
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8437. Low Maintenance Durable Cage Ladder for Boiler Room with Long Service Life Test Record
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8438. Heavy Duty Reinforced Cage Ladder for Mine Shaft Entry with Fall Protection Standard Verification
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8439. Safety Back Guard Cage Ladder for Waste Incineration Plant with Fall Arrest System Approval
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8440. Multi-Section Spliced Cage Ladder for High Chimney Maintenance with Height Adaptation Design Report
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8441. Sturdy Fully Enclosed Cage Ladder for Water Tank Access with SGS Load Bearing Test Report
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8442. Standard Dimension Uniform Cage Ladder for Industrial Park Facilities with Batch Consistency Audit
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8443. Debris Blocking Top Cage Ladder for Agricultural Grain Elevator with Falling Object Protection ...
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8444. Pre-Fabricated Prefit Cage Ladder for New Building Project with Onsite Assembly Efficiency Audit
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...
8445. Non-Slip Rung Cage Ladder for Grain Silo Climbing with Workplace Safety System Audit
[Aug 31, 2026]
[Aug 31, 2026] 1.Superior Structural Stability Full welded integral frame structure with thick carbon steel pipe, strong load-bearing capacity, effectively prevents accidental falls on walkways, staircases, tank top platforms and ...



















