Jiangsu Profile

Product List
9046. Modular Prefab House Restaurant Container House Prefabricated Modular Home Shipping House with ...
[Jun 01, 2024]
[Jun 01, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9047. Quality Assurance Water-Proof Wind-Resistant Prefabricated Steel Frame Structure for Bus Depot
[Mar 20, 2026]
[Mar 20, 2026] Product Description 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular ...
9048. New Product Strong Rigid Flexible Prefabricated Steel Frame Structure for Bus Depot
[Mar 20, 2026]
[Mar 20, 2026] Product Description 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular ...
9049. Professional Manufacturer Versatile Adaptable Efficient Prefabricated Steel Frame Structure for ...
[Mar 20, 2026]
[Mar 20, 2026] Product Description 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular ...
9050. Hot Sale Water-Proof Wind-Resistant Recyclable Prefabricated Steel Frame Structure for Stadium Arena
[Mar 20, 2026]
[Mar 20, 2026] Product Description 1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular ...
9051. High Reusable Early Stripping Drop Head Steel Frame Slab Formwork for Horizontal Concrete ...
[Mar 18, 2026]
[Mar 18, 2026] Product Description Drop-Head Formwork T-form is the 18modular for concrete slabs. T-form offers a quick and efficient solution to slab construction, with interlocking panels allowing you to customize your ...
9052. Slab Steel Frame Formwork T-Form with Early Stripping Device for Slab Concrete
[Jan 27, 2026]
[Jan 27, 2026] Steel Frame Formwork More Pupular products Aluminum frame formwork for wall/column Drop head slab formwork Plastic formwork for wall/column/slab ...
9053. Foldable Container Residence Shipping Light Steel Combined House Prefabricated Building Frame ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9054. High Quality Steel Frame 20FT Wholesale Design Customised Food Storage Folding Container House Box
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9055. Sandwich Panel Containers Home Garage Buildings Warehouse Prefabricated House Container with Light ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
9056. CE Certified Custom Size Airtight Cleanroom PVC High Speed Rolling Door with Stainless Steel Frame
[Mar 12, 2026]
[Mar 12, 2026] >>PVC Door Intelligent Opening Solution Product Description >> Product Show Material Description Application Environment Doors for interior use in normal temperature environments Size range W:1000-5000mm H:1000-5000mm ...
9057. Prefabricated Modular Bailey Bridge Steel Truss Frame Pedestrian Long Span Design Bridge
[Feb 11, 2026]
[Feb 11, 2026] Product Description CB200 Truss Press Limited Table NO. Internal Force Structure Form Not Reinforced Model Reinforced Model SS DS TS QS SSR DSR TSR QSR 200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 ...
9058. Durable Steel Frame Bailey Bridge with Anti-Corrosion Coating for Long-Span River Crossing
[Feb 10, 2026]
[Feb 10, 2026] Product Description CB200 Truss Press Limited Table NO. Internal Force Structure Form Not Reinforced Model Reinforced Model SS DS TS QS SSR DSR TSR QSR 200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 ...
9059. Steel Frame Puentes Bailey Portable Pedestriain Metal Bridge Construction
[Feb 10, 2026]
[Feb 10, 2026] Product Description CB321(100) Truss Press Limited Table No. Lnternal Force Structure Form Not Reinforced Model Reinforced Model SS DS TS DDR SSR DSR TSR DDR 321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 ...
9060. Galvanized Portable Bailey Steel Frame Truss Structure Metal Bridge Building
[Feb 10, 2026]
[Feb 10, 2026] Product Description CB321(100) Truss Press Limited Table No. Lnternal Force Structure Form Not Reinforced Model Reinforced Model SS DS TS DDR SSR DSR TSR DDR 321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 ...



















