Jiangsu Profile

Product List
12196. The Chinese Outdoor Toilet Portable Manufacturer Specializes in Mobile Toilet Unit Which Are ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
12197. Public Toilet Water Storage and Sewage Integrated Toilet Portable and Durable Outdoor Portable ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
12198. High Quality and Lowest Mobile Toilet Price Durable Toilet Cabin Are Used for Outdoor Mobile Toilet
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
12199. New Customized Toilet Shower Combination to Create a Portable Toilet Bathroom and Portable Toilet ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
12200. The Newly Designed Plastic Toilet Is Very Focused on Outdoor Portable Toilet Water Storage and ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
12201. Chinese One Piece Toilet Manufacturing Chemical Toilet Are Suitable for Public Toilet That Can Be ...
[Jun 18, 2024]
[Jun 18, 2024] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
12202. Commercial Baking Oven Equipment Stainless Steel Custom Bakery Oven High Quality Deck Oven for ...
[Oct 28, 2025]
[Oct 28, 2025] Product Description Application of the Oven An electric deck oven utilizes controllable electric heating to achieve uniform heat distribution and stable temperature within an enclosed chamber, ensuring dough and other ...
12203. Electric Multi-Function Combination Oven Stainless Steel Custom Convection Oven with Dough Proofer ...
[Oct 24, 2025]
[Oct 24, 2025] Product Description Multi-functional Combination Oven SamBake combination oven is engineered for efficient operation in small spaces. It integrates essential modules like a deck oven, convection oven, and proofer into a ...
12204. Food Dairy Processing Plant Steel Door
[Oct 11, 2025]
[Oct 11, 2025] Cleanroom Door Product Description Frame Powder coating steel frame 1.2mm (RAL5022) Square view window Arc-shaped / Right-angled Window size 400*600mm Glass Double 5mm tempered glass Keep dry With maximum ...
Company: China Electronics Chuangda Construction Equipment Technology Co., Ltd
12205. Cleanroom Door with Valid Quality Certification
[Oct 11, 2025]
[Oct 11, 2025] Cleanroom Door Product Description Frame Powder coating steel frame 1.2mm (RAL5022) Square view window Arc-shaped / Right-angled Window size 400*600mm Glass Double 5mm tempered glass Keep dry With maximum ...
Company: China Electronics Chuangda Construction Equipment Technology Co., Ltd
12206. Industrial Cleanroom Steel Door
[Oct 11, 2025]
[Oct 11, 2025] Cleanroom Door Product Description Frame Powder coating steel frame 1.2mm (RAL5022) Square view window Arc-shaped / Right-angled Window size 400*600mm Glass Double 5mm tempered glass Keep dry With maximum ...
Company: China Electronics Chuangda Construction Equipment Technology Co., Ltd
12207. Class a Fire Door, Class B Fire Door, Class C Fire Door
[Sep 25, 2025]
[Sep 25, 2025] Cleanroom Door Product Description Frame Powder coating steel frame 1.2mm (RAL5022) Square view window Arc-shaped / Right-angled Window size 400*600mm Glass Double 5mm tempered glass Keep dry With maximum ...
Company: China Electronics Chuangda Construction Equipment Technology Co., Ltd
12208. Steel Fire Door, Fire Rated Steel Door, Metal Fire Door
[Sep 25, 2025]
[Sep 25, 2025] Cleanroom Door Product Description Frame Powder coating steel frame 1.2mm (RAL5022) Square view window Arc-shaped / Right-angled Window size 400*600mm Glass Double 5mm tempered glass Keep dry With maximum ...
Company: China Electronics Chuangda Construction Equipment Technology Co., Ltd
12209. Assembly Detachable Container House Light Steel Prefab Modular House Prefabricated House
[Aug 30, 2025]
[Aug 30, 2025] Application scenarios Product Parameters SIZE 5.95*3*2.85m (Customizable) Main frame Galvanized material. The thickness is 2.15mm. Sandwich panel(Outer galvanized iron sheet) The thickness is ...
12210. Assemble Container House 2 Floor Detachable Container House Frame House Prefab
[Aug 30, 2025]
[Aug 30, 2025] Application scenarios Product Parameters SIZE 5.95*3*2.85m (Customizable) Main frame Galvanized material. The thickness is 2.15mm. Sandwich panel(Outer galvanized iron sheet) The thickness is ...



















