Jiangsu Profile

Product List
6976. Transformer Substation Kiosk with PLC Control 15kv 1000kVA Automated & Remotely Operated
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6977. Outdoor Substation Transformer Kiosk 11kv/0.415kv 750kVA Complete Mv/LV Distribution Unit
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6978. Prefabricated Substation for Renewable Energy 12kv/24kv, up to 2000kVA Smart Grid Ready
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6979. Robust & Intelligent Substation 33kv 2000kVA for Harsh & Smart Grid Applications
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6980. Factory Prefabricated Electrical House 11kv 1600kVA Modular, Quick Installation Transformer
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6981. Urable Prefabricated Unit 17.5kv 1250kVA Stainless Steel Hardware Long Life Substation Transformer
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6982. Urban Grid Compact Substation 12kv/24kv, 500-1600kVA Space-Saving, Low Noise Design
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6983. Intelligent Pad-Mounted Unit 24kv 1600kVA Energy Monitoring & Asset Management Transformer ...
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6984. Vandal-Proof Outdoor Kiosk 12kv/0.4kv 630kVA Substation Heavy-Duty Locking Secure Design
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6985. 1000kVA European Substation 11kv Compact Design Quick Delivery
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6986. ANSI Transformer Bushing 1.2KV 417A Spade Type for Pole-Mounted Transformer Application
[Apr 07, 2026]
[Apr 07, 2026] Product Parameters Item Rated Voltage Rated Current BIL Specification 1 1.2KV 125A 30KV Eyebolt / Spade Type 2 1.2KV 208A 30KV Eyebolt / Spade Type 3 1.2KV 250A 30KV Eyebolt / Spade ...
Company: Nanjing Rainbow Electric Co., Ltd.
6987. Prefab Substation with Oil Transformer 36kv 5000kVA for Primary Distribution
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6988. 1600kVA Compact Substation 12/24kv IP54 for Industrial & Utility Power
[Apr 07, 2026]
[Apr 07, 2026] Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...
Company: Jiangsu Daelim Electric Co., Ltd.
6989. Hot Selling Good quality U160 DC Outer Ribs Type Glass Insulator
[Apr 07, 2026]
[Apr 07, 2026] Product Description Product Description U160BP Tempered Glass Insulator High-performance Insulation for Overhead Transmission Lines Product Description The U160BP is a high-voltage tempered glass insulator ...
Company: Nanjing Rainbow Electric Co., Ltd.
6990. 20 Kv 22 Kv 25 Kv Three Phase Distribution Transformer Delta/Wye 50Hz
[Apr 07, 2026]
[Apr 07, 2026] The adoption of IEC-standard medium-high voltage distribution transformers (typical range: 10kV-72.5kV, 500kVA-30MVA) in North America (a region historically dominated by NEMA/IEEE standards) has seen significant ...
Company: Jiangsu Daelim Electric Co., Ltd.



















