Jiangsu Profile

Product List
18796. Stainless Steel Three-Phase 4-Meter Position
[Apr 27, 2025]
[Apr 27, 2025] Product Description Main Configuration Component Specification Quantity Main Control Unit Molded Case Circuit Breaker NM1-250/3300 200A 1 Switch Terminal FJ6GD-250/4×16 3 Neutral ...
18797. Stainless Steel Three-Phase Single-Meter Position
[Apr 27, 2025]
[Apr 27, 2025] Product Description Main Configuration Component Specification Quantity Pre-meter Unit Isolating Switch NH2-125/2P 100A 1 Meter Chamber Plug Connector YD-D1 60A 1 Post-meter Unit Miniature ...
18798. M8 Junction Block 8 Port PNP NPN Series for Sensors and Actuator
[Feb 27, 2025]
[Feb 27, 2025] SVLEC's 8 port junction box is used for distribution signal from PLC to sensors or actuators , it can provide 8 ports with M8 connectors for connection with the sensors and actuators . The junction box is the terminal ...
Company: Kunshan Svl Electric Co., Ltd.
18799. Pressure Gauge for Sf6 Gas Insulated Switchgear, Sulfur Hexafluoride Gas Pressure Manometer
[Oct 23, 2024]
[Oct 23, 2024] Manufacturer Yangzhou Huifeng Meter Co., Ltd (Established in 1996) Main Products common pressure gauge (from size 1'' to size 6''), liquid filled gauge, tyre pressure gauge, refrigerant pressure gauge, all ...
Company: Yangzhou Huifeng Meter Co., Ltd.
18800. High Quality (Solid model) Stainless Steel Electric Contact Pressure Gauge with Good Quality
[Oct 23, 2024]
[Oct 23, 2024] Manufacturer Yangzhou Huifeng Meter Co., Ltd (Established in 1996) Main Products common pressure gauge (from size 1'' to size 6''), liquid filled gauge, tyre pressure gauge, refrigerant pressure gauge, all ...
Company: Yangzhou Huifeng Meter Co., Ltd.
18801. 100A ATS Cabinet Box to Dubai Saudi Arabia
[Aug 21, 2024]
[Aug 21, 2024] Specifications Mains supply monitoring function, auto start, auto transfer, auto protection, auto power supply 1. Standard configuration: Control option switch, transfer option switch, emergency stop, buzzer, ...
Company: Jiangsu Aisikai Electric Co., Ltd.
18802. Transformer Radiator for High Voltage (15000kVA)
[Jan 17, 2024]
[Jan 17, 2024] 1. Radiators should be Fabricated / Shot blasted as per drawings. 2. Radiators should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Radiators Panels ...
18803. Transformer Radiators for Fuel Transformer
[Jan 17, 2024]
[Jan 17, 2024] 1. Radiators should be Fabricated / Shot blasted as per drawings. 2. Radiators should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Radiators Panels ...
18804. Overload Protection
[Jul 10, 2023]
[Jul 10, 2023] Product introduction: This overload limiter is designed for building construction machinery development of protection device, can provide in the equipment load running sound, light, electric alarm, this product has the ...
Company: Shenxi Machinery Co., Ltd.
18805. China Copper Bonded Grounding Rod
[Jul 10, 2023]
[Jul 10, 2023] China Copper Bonded Grounding Rod Description: The grounding rod also known as ground pole or ground net,which is designed and manufactured based on the theory of improving internal conductivity of grounding conductor ...
18806. 1000 kVA Painting Corrugated Transformer Tanks
[Mar 30, 2023]
[Mar 30, 2023] 1. Tanks should be Fabricated / Shot blasted as per drawings. 2. Tanks should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Tanks should have Primer coat ...
18807. 1000kVA 35kv to 400V Oil Immersed Transformer with Conservator Tank
[Mar 30, 2023]
[Mar 30, 2023] 1. Tanks should be Fabricated / Shot blasted as per drawings. 2. Tanks should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Tanks should have Primer coat ...
18808. Rectangular Tanks of Distribution Transformer
[Mar 30, 2023]
[Mar 30, 2023] 1. Tanks should be Fabricated / Shot blasted as per drawings. 2. Tanks should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Tanks should have Primer coat ...
18809. Fin Pitch 40mm Corrugated Cooling Fin Wall
[Mar 30, 2023]
[Mar 30, 2023] 1. Tanks should be Fabricated / Shot blasted as per drawings. 2. Tanks should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Tanks should have Primer coat ...
18810. Three Phase 10/0.42kv 150kVA Oil Immersed Transformer Tank
[Mar 30, 2023]
[Mar 30, 2023] 1. Tanks should be Fabricated / Shot blasted as per drawings. 2. Tanks should be Leak proof, and offer test report. 3. Pre Despatch inspection will be done by our quality inspectors. 4. Tanks should have Primer coat ...



















