Jiangsu Profile

Product List
77926. Aluminum / Brass Nh Thread Fire Hose Coupling with Heavy-Duty Connection Options
[Aug 01, 2025]
[Aug 01, 2025] Introducing our robust and enduring Multi-Size Aluminum Stainless Storz Coupling, tailor-made for fire hoses! Designed with precision and crafted for durability, this coupling ensures a reliable connection every time, ...
Company: Taizhou Shenlong Fire Science and Technology Co., Ltd.
77927. High-Quality Aluminum Brass Storz Fire Hose Coupling Fitting
[Jul 31, 2025]
[Jul 31, 2025] Aluminum Brass Storz Fire Hose Coupling Fire Pipe Fitting Product Description A hose coupling is a connector on the end of a hose to connect (or couple) it with another hose or with a tap or a hose appliance, such ...
Company: Taizhou Shenlong Fire Science and Technology Co., Ltd.
77928. PP PE Extrusion Machine Plastic Masterbatch Production Line Filler Masterbatch Machine
[Jul 26, 2025]
[Jul 26, 2025] Description: The machines are designed by suing the "toy bricks" principle, the screw configuration, barrel setup, L/D or mode of feeding and venting, screen changing, way of granulating, and the control mode can ...
77929. Production of Calcium Carbonate Filler Masterbatch Twin Screw Extruder
[Jul 26, 2025]
[Jul 26, 2025] Description: The machines are designed by suing the "toy bricks" principle, the screw configuration, barrel setup, L/D or mode of feeding and venting, screen changing, way of granulating, and the control mode can ...
77930. Twin Screw Extruder Machine Production Line for Masterbatch
[Jul 25, 2025]
[Jul 25, 2025] Description: The machines are designed by suing the "toy bricks" principle, the screw configuration, barrel setup, L/D or mode of feeding and venting, screen changing, way of granulating, and the control mode can ...
77931. Plastic Granulation with Water / Air Pelletizing Line
[Jul 24, 2025]
[Jul 24, 2025] Description: The machines are designed by suing the "toy bricks" principle, the screw configuration, barrel setup, L/D or mode of feeding and venting, screen changing, way of granulating, and the control mode can ...
77932. Glass Suction Cups Lifter to Lift Large Glass Plate Raised Floor Installation
[Jul 22, 2025]
[Jul 22, 2025] Product Description glass suction cup lifter, raised floor suction lifter, 200 lb suction lifter, bulk suction lifter manufacturer,vacuum suction lifter,heavy duty suction cup lifter The first commercial suction ...
77933. 20FT Prefabricated Container House Modular Design Office Bedroom Villa Hotel Mall Versatile ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77934. 20 40 Foot Factory Customized Prefab Superior Quality China Flat Pack Container Home Prefabricated ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77935. 2 Layer Portable Movable Bathroom Bedroom Apartment Prefabricated Container House with 2 Bedrooms ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77936. Australian 20FT 40FT Container House Modern Prefabricated Mobile Container Home with Full Bathroom ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77937. Hot Sale Prefab Container House Flat Prefabricated Flat Pack Container House Made in China
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77938. 40 FT Prefabricated Container Glass Wall Residential Container Homes 2 Bedrooms Kitchen with ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77939. Applications Simple Warehouse Home Office Bedroom Hotel Easily Transportable Steel Modular ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
77940. 10FT 20FT Custom Luxury Mini Container Cottage House Homes Modern Mobile Prefab Light Steel Tiny ...
[Jul 07, 2025]
[Jul 07, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.



















