Jiangsu Profile

Product List
9046. High Flash Alkyd Industrial Coating for Bridge and Construction
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9047. High Flash Alkyd Industrial Coating Safe Transport Non-Hazardous Grade
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9048. High Solid Alkyd Industrial Coating Stable Performance Long Shelf Life
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9049. Low Voc Alkyd Industrial Coating for Maintenance and Refurbishment
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9050. High Flash Alkyd Industrial Coating for Industrial Steel and Machinery
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9051. Low Voc Alkyd Industrial Coating for Metal Equipment and Tank
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9052. High Flash Alkyd Industrial Coating for Steel Structure Anti-Rust Protection
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9053. High Solid Low Voc Alkyd Anti-Corrosion Industrial Coating for Metal Structures
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9054. Fast Dry High Solid Alkyd Industrial Coating Good Adhesion High Coverage
[Jun 10, 2026]
[Jun 10, 2026] Product Description Item Valuve Theoretical usage 5.5 m²/kg (at 50 µm dry film, excluding loss) Specific gravity ≈1.40 Drying time (25°C) Touch dry ≤2 h, Hard dry ≤24 h Flash point 65°C Application methods Spray, brush, ...
9055. Fast Dry High Solid Alkyd Coating Good Adhesion High Coverage
[Jun 10, 2026]
[Jun 10, 2026] Product Description Parameter Value Solid content (by wt.) ≥70% Specific gravity 1.5 ± 0.2 kg/m³ Recommended DFT 50-80 μm Theoretical coverage 7-8 m²/kg (excluding loss) Touch dry (25°C) 0.5 hour Hard dry (25°C) 24 hour ...
9056. Anti Rust High Flash Point High Solid High Gloss Alkyd Industrial Coating
[Jun 10, 2026]
[Jun 10, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
9057. Excellent Adhesion High Flash Point High Solid High Gloss Alkyd Coatings
[Jun 10, 2026]
[Jun 10, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
9058. High Performance High Flash Point High Solid High Gloss Alkyd Industry Coating
[Jun 10, 2026]
[Jun 10, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
9059. Heavy Duty Alkyd Industrial Coating High Flash Point High Gloss High Solids
[Jun 10, 2026]
[Jun 10, 2026] Construction Instructions 1. Use power tools or hand tools to stir thoroughly. Apply at 5 ° C to 40°C. 2. Application methods: airless spray, air spray, brush, roll. 3. Diluent: Exempted solvent, with an addition ratio ...
9060. Durable Epoxy Paint Protect Factory Epoxy Flooring Surfaces
[Jun 10, 2026]
[Jun 10, 2026] Parameter Result Color Bright green, medium gray. Theoretical usage generally 5m²/ kg (based on 100 microns dry film, excluding loss) Specific weight approximately 1.25 Drying time Surface dry at 25 °C ≤1 hour, full dry ...



















