Made-in-china.com

Made-in-Jiangsu.com

Home » Featured Products »

Mortar

» Jiangsu Product List

Product List

Secondary Unit Substation for Cities 24kv 800kVA Aesthetic & Tamper-Proof Enclosure
Contact Now

15061.

Secondary Unit Substation for Cities 24kv 800kVA Aesthetic & Tamper-Proof Enclosure Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Solar PV Compact Substation 12kv, 1000-1600kVA Low Loss Transformer, Outdoor Type
Contact Now

15062.

Solar PV Compact Substation 12kv, 1000-1600kVA Low Loss Transformer, Outdoor Type Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Wind Farm Substation 36.75kv/0.69kv, 2500kVA Compact & Corrosion Resistant Design
Contact Now

15063.

Wind Farm Substation 36.75kv/0.69kv, 2500kVA Compact & Corrosion Resistant Design Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

1000kVA 2500kVA 3500kVA 5000kVA Three Phase Europe Prefabricated Substation Manufacturers
Contact Now

15064.

1000kVA 2500kVA 3500kVA 5000kVA Three Phase Europe Prefabricated Substation Manufacturers Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

High-Voltage/Low-Voltage 2/0.4kv Mobile Outdoor Prefabricated Transformer Substation 10/15/20K
Contact Now

15065.

High-Voltage/Low-Voltage 2/0.4kv Mobile Outdoor Prefabricated Transformer Substation 10/15/20K Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

250kVA IEC60076 Standard 1250kVA Primary and Secondary Compact Prefabricated Substation Australia
Contact Now

15066.

250kVA IEC60076 Standard 1250kVA Primary and Secondary Compact Prefabricated Substation Australia Open Details in New Window [Jan 27, 2026]

Product Description Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to ...

Company: Jiangsu Daelim Electric Co., Ltd.

24mm Ar Glass Fiber Chopped Strand for Reinforcing Grc
Contact Now

15067.

24mm Ar Glass Fiber Chopped Strand for Reinforcing Grc Open Details in New Window [Jan 20, 2026]

Product Description AR glass chopped strand has a high degree of corrosion resistance in the environment of cement and other alkaline medium. It can be used to reinforce cement gypsum and other inorganic materials. ...

Company: Union Composites Changzhou Co., Ltd.

Evironmental Prefabricated Distribution Box Variation Box-Type Transformer Substation
Contact Now

15068.

Evironmental Prefabricated Distribution Box Variation Box-Type Transformer Substation Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

12/ 100-800kVA Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer
Contact Now

15069.

12/ 100-800kVA Electricity Power Box-Type Prefabricated Transformer Kiosk Substations Manufacturer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

IEC CE Standard 500kVA 33kv to 0.4kv Compact Transformer Substation
Contact Now

15070.

IEC CE Standard 500kVA 33kv to 0.4kv Compact Transformer Substation Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

11kv 15kv 33kv 33kv 400-2000kVA Export-Type European-Style Outdoor High High-Quality Transformer
Contact Now

15071.

11kv 15kv 33kv 33kv 400-2000kVA Export-Type European-Style Outdoor High High-Quality Transformer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

15kv to 400V 1250kVA Prefabricated Substation with Oil Immersed Distribution Transformer
Contact Now

15072.

15kv to 400V 1250kVA Prefabricated Substation with Oil Immersed Distribution Transformer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Electric Utility Standard Cdss 800kVA 15kv 33kv to 0.4kv Compact Substation Transformer
Contact Now

15073.

Electric Utility Standard Cdss 800kVA 15kv 33kv to 0.4kv Compact Substation Transformer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

Outdoor Wind Power Step up 10/13/20/33/40kv 200/630/1000/2500/7250kVA Prefabricated Oil Immersed ...
Contact Now

15074.

Outdoor Wind Power Step up 10/13/20/33/40kv 200/630/1000/2500/7250kVA Prefabricated Oil Immersed ... Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.

200 kVA 160 kVA Solar Compact Substation Prefabricated Electrical Substation Transformer
Contact Now

15075.

200 kVA 160 kVA Solar Compact Substation Prefabricated Electrical Substation Transformer Open Details in New Window [Jan 15, 2026]

Rapid Deployment & Cost Efficiency Factory-preassembled and tested, these substations can be installed and commissioned on-site within 5-8 days, reducing construction time and labor costs by up to 40-50% compared to ...

Company: Jiangsu Daelim Electric Co., Ltd.