Jiangsu Profile

Product List
11206. Hydraulic Single RAM Bop 13 5/8"-10000psi
[Jun 01, 2026]
[Jun 01, 2026] Hydraulic Single Ram BOP 13 5/8"-10000psiProduct Introduction The pressure-bearing and pressure-controlling parts are made from forged, the chamber of body appear the oval on the longitudinal section of vertical piston ...
11207. 16A Single RAM Bop Double RAM Bop Blowout Preventer
[Apr 07, 2026]
[Apr 07, 2026] 16A Single RAM BOP double RAM BOP Blowout Preventer For Oil Well Control RAM BOP The ram BOP is designed to seal off the annular between casing and well head. In case of ...
11208. Capsule Accumulator Station Bop Control System
[Mar 30, 2026]
[Mar 30, 2026] Capsule accumulator station Stainless Steel Bladder Accumulator /Model (Mpa) Nominal PressUr L) Nominal Volume Size(mm) M d Ф 1 Ф 2 Ф 3 Ф 4 N. Ф 5 L ...
11209. Stainless Steel Capsule Accumulator Drilling Rig
[Mar 30, 2026]
[Mar 30, 2026] Stainless steel capsule accumulator Stainless Steel Bladder Accumulator /Model (Mpa) Nominal PressUr L) Nominal Volume Size(mm) M d Ф 1 Ф 2 Ф 3 Ф 4 N. Ф 5 L ...
11210. X-Mas Tree Caps (Bottom Hole Test Adapter - BHTA)
[Mar 27, 2026]
[Mar 27, 2026] X-Mas Tree cap is a top connector which is used on the top of X-Mas Tree, It's main function is to provide access to the X-Mas Tree bore. It is basically consisting of a Flanged body, Blanking Plug, Hammer Nut as ...
11211. 16A 13 5/8" 10000psi Shaffer Annular Bop for Well Drilling
[Mar 25, 2026]
[Mar 25, 2026] 16A 13 5/8" 10000psi shaffer annular bop for well drilling In case of blowout and well-sealing is needed, high pressure oil coming from control system enters the bottom closing chamber from bottom inlet to push ...
11212. Bop Test Stump or Bop Test Stand
[Mar 24, 2026]
[Mar 24, 2026] BOP TEST STAND Blow Out Preventer (BOP) test stumps are often used for manufacturers to test their BOP or drillers testing operations at off-shore and on-shore drilling rig. BOP TEST STUMP is designed and ...
11213. Tubing Head and Tubing Spool
[Mar 19, 2026]
[Mar 19, 2026] Tubing head and tubing spool Tubing head is a body with two flange that can supports the tubing string on a oilwell, seals off the pressure between the casing and tubing annulus, and connect with tubing adapter on ...
11214. Blowout Preventer Coiled Tubing Bop
[Mar 13, 2026]
[Mar 13, 2026] Coiled Tubing BOP Coiled Tubing BOP Coiled Tubing BOP is an important well control unit against overflow (oil, gas and water) and well blowout, thus to avoid resource waste, protect equipment and human ...
11215. Blowout Preventer Stack -180/80X35 Bop Stack
[Mar 13, 2026]
[Mar 13, 2026] Blowout equipment is designed for oil and gas wellhead pressurization during construction, development and repair, to prevent showings of oil, gas and water and blowouts to ensure safe work, conservation of resources ...
11216. Hydril Blowout Preventer Packer Seal Ring Replacement Packing Sear for Bop
[Mar 13, 2026]
[Mar 13, 2026] Hydril Blowout Preventer Packer Seal Ring Replacement Packing Sear for Bop Characters of BOP pare parts: In the structure, it is divided into annular blowout preventer with spherical plastic core, annular blowout ...
11217. 16A 15000 Psi Double RAM Bop/Blowout Preventer for Well Drilling
[Mar 13, 2026]
[Mar 13, 2026] 16A 15000 psi double ram Bop/Blowout Preventer for well drilling The ram BOP is designed to seal off the annular between casing and well head. In case of closing, such operation as circulating drilling fluid, ...
11218. 16A Bop Blowout Preventer/RAM Bop/Annular Bop
[Mar 13, 2026]
[Mar 13, 2026] BOP ANNULAR BOP In the case of being equipped with hydraulic control system,the annular BOP is capable to pack off the annular spaces with the different sizes if there's ...
11219. Wellhead Control Equipment Four RAM Blowout Preventer Coiled Tubing Quad Bop
[Mar 09, 2026]
[Mar 09, 2026] A coiled tubing ram preventer is used as part of wellhead equipment to seal the oil and gas well wellheads during workover, development and drilling using a continuous coiled steel pipe string or a coiled continuous ...
11220. High-Performance 16A Hydraulic RAM Bop for Oilfield Operations
[Mar 09, 2026]
[Mar 09, 2026] A coiled tubing ram preventer is used as part of wellhead equipment to seal the oil and gas well wellheads during workover, development and drilling using a continuous coiled steel pipe string or a coiled continuous ...



















