Jiangsu Profile

Product List
3661. Powered by Cummins Engine 200 Kw Diesel Generator 250 kVA Genset
[Jul 29, 2025]

Detailed Photos Model SC250DCE Rated Power(kw/kva) 200/250 Max Power(kw/kva) 220/275 Rated Voltage(V) 400/230 Max current output(A) 360 Rated Frequency(Hz) 50 Power Factor 0.8 level of ...
3662. Premium Mini Loader Snow Blower Attachments for Skid Steers
[Jul 29, 2025]

Mini Loader Skid Steer Snow Blower Attachments 750kg 850kg 950kg Skid Steer Loader For Sale Product Parameters Engine Engine model Yanmar 380 No. of cylinders 3 3 cylinder Net ...
3663. High-Performance Japanese Engine Skid Steer Loader for Factories
[Jul 29, 2025]

Japanese engine track skid steer loader for factory Product Parameters Engine Engine model Yanmar 380 No. of cylinders 3 3 cylinder Net Power 17.8kw Dimensions Operating height 2695mm ...
3664. Compact Crawler Skid Steer Loader for Small Farms
[Jul 29, 2025]

Small Farm Loaders Powerful Home Use Crawler Mini International Skid Steer Track Loader Product Parameters Engine Engine model Yanmar 380 No. of cylinders 3 cylinder Net ...
3665. Trailer Mounted Silent Generator 7.5– 820kVA for Power Station Use
[Jul 31, 2025]

HIGH VOLTAGE GENERATOR SET Advantages Standard configuration TC9.0 intelligent parallel operation control system, with imported control module, expandable redundancy function for control redundancy, integrated ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3666. Al2543 Loading Arm for Chemical Liquid Transfer
[Jul 11, 2025]

Product Description The structure of AL2543 Loading arm: AL2543 is a land - based bottom - loading crane tube, suitable for loading and unloading volatile media such as liquefied petroleum gas and liquid ammonia. Its ...
3667. Al2504 Bottom Loading Arm for Safe & Efficient Handling of High-Viscosity Media
[Jul 11, 2025]

The structure of AL2504Loading arm: AL2504 is a bottom loading arm specially designed for high-viscosity or poorly flowable media like crude oil and residual oil, suitable for side bottom loading/unloading of ...
3668. 2500kVA 10.5kv High Voltage Generator for Energy Projects
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3669. 2250kVA High Voltage Generator with Advanced Control Technology
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3670. 2000kVA 13.8kv Robust High Voltage Diesel Generator for Industry
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3671. 1800kVA 11kv High Voltage Generator for Oil and Gas Facilities
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3672. 1500kVA 6.6kv High Voltage Synchronous Generator for Mining
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3673. Reliable 1200kVA 10.5kv High Voltage Generator for Utilities
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3674. Industrial 1000kVA 13.8kv High Voltage Generator for Power Plants
[Jul 31, 2025]

Item Details Trade Terms FOB / CIF / EXW (Negotiable) Payment Terms T/T 30% deposit, 70% before shipment (Negotiable) Currency USD / EUR / CNY Delivery Time 10-30 days after deposit Port of Loading Shanghai ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
3675. 100kVA Open Frame Generator Set for Continuous Industrial Power
[Jul 31, 2025]

HIGH VOLTAGE GENERATOR SET Advantages Standard configuration TC9.0 intelligent parallel operation control system, with imported control module, expandable redundancy function for control redundancy, integrated ...
Company: Changzhou Pacific Electric Power Engineering Co., Ltd.
