Jiangsu Profile

Famous Export Brand

Featured Products
Product List
39646. Eco Friendly Canadian Low Cost Prefab 2 Bedroom Office Pod Island Solar-Powered Homes House
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
39647. Luxury 12 3 4 5 6 Bedroom 20FT 30FT 40FT Expandable Foldable Folding Shipping Container Office Home ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
39648. Prefabricated Steel House 70 Square Meter Plan 3 Bedroom Floor Design Expandable Container Home
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
39649. Magic House Container Restaurant Duplex House Modular Less Than $100 USD Per M2
[Mar 18, 2025]
[Mar 18, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
39650. 20 FT Expandable Container House Prefabricated-Building House Modular House Steel Structure Mini ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
39651. Automatic Bottle Labeler Hot Melt Glue Labeling Machine OPP or BOPP Labeling Machine, Etiquetadora ...
[Sep 09, 2024]
[Sep 09, 2024]
Automatic bottle labeler Hot Melt Glue Labeling Machine OPP or BOPP Labeling machine,etiquetadora por goma calinete ,maquina de etiquetadora Product Description OPP labeling machine in wide applications,Hot ...
Company: Suzhou Yaoshi Machinery Co., Ltd.
39652. Low Cost ISO 20FT 40FT Expandable Container Family Houses Office High Quality Modular Residental ...
[May 08, 2025]
[May 08, 2025] For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
39653. Lianggong High-Strength Adjustable Concrete 65/120 Steel Frame Formwork with Plywood for ...
[Apr 16, 2026]
[Apr 16, 2026] Lianggong High-Strength Adjustable Concrete 65/120 Steel Frame Formwork with Plywood for Construction Product Description LG-120 Steel Frame Formwork With a high-strength steel frame as its skeleton and plywood as ...
39654. High Strength Adjustable 120 Steel Frame Formwork for Concrete Wall Construction
[Apr 14, 2026]
[Apr 14, 2026] Product Introduction 120 steel frame formwork is a modular formwork system consisting of a 120mm-height steel frame and an 18mm thick plywood panel, with a designed load capacity of 80–100 KN. Made of high-strength ...
39655. Lianggong Reusable High Strength Steel Concrete Shuttering Metal Formwork for ...
[Apr 14, 2026]
[Apr 14, 2026] Lianggong Steel Concrete Shuttering Metal Formwork for Bridge/Building/Culvert/Dam Construction Product Description Steel Formwork System Steel formwork is strong and durable, therefore can be reused many times in ...
39656. Formwork Maker Steel Frame Formwork for Wall Slab Construction Adjustable Plywood Concrete
[Apr 13, 2026]
[Apr 13, 2026] Formwork Maker Steel Frame Formwork for Wall Slab Construction Adjustable Plywood Concrete Product Description Steel Frame Formwork Steel frame formwork is made up of 12mm thick plywood covered with hollow ...
39657. Lianggong Customization Steel Concrete Mould Metal Formwork for Bridge/Building/Culvert Construction
[Apr 14, 2026]
[Apr 14, 2026] Lianggong Steel Concrete Shuttering Metal Formwork for Bridge/Building/Culvert/Dam Construction Product Description Steel Formwork System Our company can design and manufacture various specifications of steel ...
39658. High Efficiency Steel Frame Wall Slab Forming System for Construction
[Apr 09, 2026]
[Apr 09, 2026] Product Description Steel Frame Formwork Steel frame formwork is made up of 12mm thick plywood covered with hollow steel. It is a complete product system with many types, such as wall formwork, column formwork, ...
39659. Formwork Manufacturer Slab Tunnel Formwork for Cellular Structure House
[Apr 09, 2026]
[Apr 09, 2026] Product Description Tunnel formwork is a kind of combined type formwork, which combines the formwork of cast-in-place wall and the formwork of cast-in-place floor on the basis of the construction of large formwork, so ...
39660. Wall Construction with Quick Assembly Steel Frame Formwork Solutions
[Apr 09, 2026]
[Apr 09, 2026] Steel Frame Formwork The steel frame formwork features 12mm thick plywood in hollow steel, forming a comprehensive system with diverse types like wall, column, slab, and angle formworks. It includes a range of ...



















