Jiangsu Profile

Product List
35011. Home Use Modular Prefabricated House with 3 Bedrooms and Living Room Prefab Folding Container House
[May 08, 2025]
[May 08, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
35012. High Quality Prefabricated Modular Container Houses, Modular Family Residences with Balconies, Sold ...
[Mar 18, 2025]
[Mar 18, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand drill, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
35013. Grande Foldable Prefab Container of Houses Mobile Homes Customized Fast Assemble Container House ...
[Mar 01, 2026]
[Mar 01, 2026]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
35014. Q355 Steel Metal Frame Aluminium Slab Formwork Early-Stripping Drop Head Aluminum Slab Formwork for ...
[Nov 13, 2026]
[Nov 13, 2026]
RAPID PROFESSIONAL FORMWORK SYSTEMS MANUFACTURER Engineered for Faster Construction. Built for Repeated Use. Aluminum Frame Formwork | Steel Frame Formwork | H20 Formwork | Plastic Formwork | Drophead Formwork | ...
35015. Factory Direct Sales Modular Sturdy Steel Warehouse for Multi-Storey Car Parking
[Jul 17, 2025]
[Jul 17, 2025]
1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
35016. Premium Flexible Stone Wall Panels for Elegant Interiors
[Jul 29, 2026]
[Jul 29, 2026]
Product Description Soft ceramic coarse line stone, also known as coarse linen texture, combines two major advantages: light weight, flexibility and distinct linear texture. It can be easily bent to form curved shapes, ...
Company: Jiangsu Neolithic New Building Materials Technology Co., Ltd
35017. Lianggong Steel H20 Timber Beam Metal Cantilever Shear Wall Bridge Pier Elevator Shaft Core Wall ...
[Aug 25, 2026]
[Aug 25, 2026]
Product Description Cantilever Climbing Formwork The cantilever climbing formwork CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. ...
35018. Flexible Space Design Factory Steel Structure Goods
[Jul 29, 2026]
[Jul 29, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Fast build: Onsite prefabrication, 30%-50% quicker than concrete. 300m2 by 5 workers in 30 days. Weather-resistant: ...
35019. Ready to Ship Waterproof Foldable Prefab Portable Container House for Sale Shipping Light Steel ...
[Jun 09, 2026]
[Jun 09, 2026]
Product Description Opening size L*W*H 5800*2438*2620mm Length Inner length /external length: 5.80m/5.90m Width Inner width /external width: 2.3m/2.50m Height Inner height/external height: ...
Company: Hig Housing Tech Co., Ltd.
35020. Chinese Made Container House, Residential Luxury Prefabricated House, Foldable Container Houses, ...
[May 08, 2025]
[May 08, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
35021. Lianggong Early Stripping Slab T-Form Metal Formwork Plastic Formwork for Slab
[Oct 27, 2026]
[Oct 27, 2026]
Product Description T-FORM FOR SLAB T-Form Design: Easy to install, disassemble, and move, saving setup and removal time. Large Panel Sizes: Available in up to 1800x1200mm, reducing construction time and costs. Early ...
35022. Folding Container House, Micro House, Modular Living House, Modular Living Prefabricated House, ...
[May 08, 2025]
[May 08, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
35023. Excellent Workshop Steel Structure Constructions
[Jul 29, 2026]
[Jul 29, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Fast build: Onsite prefabrication, 30%-50% quicker than concrete. 300m2 by 5 workers in 30 days. Weather-resistant: ...
35024. Durable Workshop Steel Structure for Heavy-Duty Industrial Use
[Jul 29, 2026]
[Jul 29, 2026] PRODUCT INTRODUCTION Core Advantages and Features 1. High construction efficiency, quick commissioning Fast build: Onsite prefabrication, 30%-50% quicker than concrete. 300m2 by 5 workers in 30 days. Weather-resistant: ...
35025. Factory Direct Sales Quick Installation Sturdy Steel Frames for Quick Assembly
[Jul 18, 2025]
[Jul 18, 2025]
1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...