Jiangsu Profile

Product List
26806. China Wholesale Multifunctional Standrard Modern Mobile Home Modular Container Steel Structure ...
[May 29, 2026]
[May 29, 2026]
SIZE(m) LENGTH*WIDTH* EAVE HEIGHT TYPE SINGLE SPAN, DOUBLE SPAN, MULTI-SPAN. ONE FLOOR, TWO FLOORS, THREE FLOORS. BUILDING FOUNDATION STEEL FOUNDATION WITH ANCHOR BOLTS COLUMN & BEAM MATERIAL:Q235 & Q345 & ...
26807. Thailand's Best-Selling Prefabricated Houses, Modular Houses That Can Be Quickly Assembled, and ...
[May 08, 2025]
[May 08, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
26808. Tecon Ring-Lock Stair Tower for Safety and Convenience
[Mar 09, 2026]
[Mar 09, 2026]
TECON Ring-Lock Stair Tower for Safety and Convenience Brief Introduction TECON Ring-Lock Stair Tower for Safety and Convenience(Shoring Tower TST60)is the most cost-effective supporting frame system in formwork ...
26809. Zhongnan Luxury Quickly Assemble Wooden Pod Mobile Homes Portable Mini Modular Office Tiny House ...
[Apr 16, 2026]
[Apr 16, 2026]
Product Description Advantages of SUZHOU ZHONGNAN container house: 1. Activity: removable and reusable. 2. Rapid assembly: short manufacturing period and no foundation. 3. Steel-reinforced structure, safety, ...
26810. Manufacture Factory Supplier Customized Flat Pack Prefab Living Office Building Camp Prefabricated ...
[Mar 16, 2026]
[Mar 16, 2026]
Successful Case Details of Container house project case : 1.We have delivered over 40 large-scale projects across countries including China, the United States, Japan, South Korea, Indonesia, the Philippines, Vietnam, ...
26811. Fluorocarbon Coated Power Plant Steel Structures for Enhanced Corrosion Resistance
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation, safety as the foundation; structural load-bearing, steel as the soul. • The steel structure main body can withstand wind loads and temperature differences, is suitable for the ...
26812. Q355ND Steel Power Plant Structures Stable at -40℃ for High-Latitude Projects
[Apr 22, 2026]
[Apr 22, 2026] PRODUCT INTRODUCTION Power plant operation, safety as the foundation; structural load-bearing, steel as the soul. • The steel structure main body can withstand wind loads and temperature differences, is suitable for the ...
26813. High-Strength Lightweight Reusable ABS Plastic Formwork for Easy Concrete Shaping
[May 27, 2026]
[May 27, 2026] High-Performance WL60 ABS/PP Plastic Formwork System Our high-performance plastic formwork system is designed for modern concrete construction projects, offering durability, lightweight handling, high reusability, and ...
26814. Durable Heavy-Duty Steel Storage Solutions at Competitive Prices
[Jul 17, 2025]
[Jul 17, 2025]
1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
26815. Customized Prefabricated Time-Saving Hard Steel Office Building for Quick Assembly
[Jul 17, 2025]
[Jul 17, 2025]
1 Steel Structure Parts (Q235 orQ355) Hot galvanized or painted. (1) Steel Column: H Section Steel (2) $teel Beam: H Section Steel 3) Withstand Wind coumn: H Section Steel (4) Connected rod: Circular Tube (5) ...
26816. Flood Protection Water Barrier in Metallic Aluminum with High Strength
[Dec 06, 2024]
[Dec 06, 2024]
Aluminum alloy removable flood wall for hydraulic engineering Product advantages: 1.Detachable 2.Flexible assembly and disassembly, the corresponding speed is extremely fast 3.Not inferior to the strength of ...
Company: Newflag Technology Co., Ltd.
26817. High Quality Prefabricated Modular Container Houses, Modular Family Residences with Balconies, Sold ...
[Mar 18, 2025]
[Mar 18, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
26818. Pre Assembled Apartment 30 40 Foot Portable Prefabricated Expandable Container House for Modular ...
[May 08, 2025]
[May 08, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, hand ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
26819. Modular Housing Store, High-Quality Prefabricated Housing, Luxury 2 Bedroom Container House Prefab ...
[Mar 18, 2025]
[Mar 18, 2025]
For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
26820. Prefabricated Steel Structure House Container House Mobile Type with Steel Frame Support
[May 19, 2026]
[May 19, 2026]
SIZE(m) LENGTH*WIDTH* EAVE HEIGHT TYPE SINGLE SPAN, DOUBLE SPAN, MULTI-SPAN. ONE FLOOR, TWO FLOORS, THREE FLOORS. BUILDING FOUNDATION STEEL FOUNDATION WITH ANCHOR BOLTS COLUMN & BEAM MATERIAL:Q235 & Q345 & ...



















