Jiangsu Profile

Product List
19816. High-Quality Air Conditioner for Liquid/Air Cooling Portable Mini Condensing Unit
[Jul 24, 2024]

WHY CHOOSE US? · Response Time:Within 24 hous.The average is within 1 hours. ·Quote after getting information. · Remote vedio supporting. · Design drawing was available. · Provide ...
19817. Air Cooler Cold Room Inside Refrigeration Evaporator Unit Evaporation Air Evaporator Cooler
[Jul 24, 2024]

WHY CHOOSE US? · Response Time:Within 24 hous.The average is within 1 hours. ·Quote after getting information. · Remote vedio supporting. · Design drawing was available. · Provide ...
19818. Leakproof 32oz 40oz Stainless Steel Tumbler with Wide Mouth Straw Lid
[Jul 17, 2024]

Product Description Product Stainless Steel Bottle/Tumbler/Mug Material Double Wall 18/8 Stainless Steel Volume 40oz Printing Silk Printing,Heat Transfer, Laser Etching Sticker and etc Lid Screw ...
Company: LIANYUNGANG KAESHING INTERNATIONAL TRADING CO., LTD.
19819. 750ml Sport Cola Stainless Steel Water Bottles Vacuum Insulated Water Bottle
[Jul 17, 2024]

Product Description Product Stainless Steel Bottle/Tumbler/Mug Material Double Wall 18/8 Stainless Steel Volume 750ml Printing Silk Printing,Heat Transfer, Laser Etching Sticker and etc Lid Screw ...
Company: LIANYUNGANG KAESHING INTERNATIONAL TRADING CO., LTD.
19820. Factory Supply 52100 Chrome 10cr6 Bearing Steel Balls
[Jul 11, 2024]

Chrome steel ball Chrome steel ball/bearing steel ball 1. Material AISI 52100/ 100Cr6/ 100C6/ SUJ2/ Wks 1.3505 2. Size Range 0.6mm-180mm 3. Grade G10-1000 4. Hardness 58-65 HRC 5. Characteristic (a)Mainly ...
Company: Changzhou Huari Steel Ball Co., Ltd.
19821. 1kw 2kw 500W 1000W 2000W 3000W 4000W Mild Stainless Steel Iron Aluminum Copper Stainless Steel CNC ...
[Jul 09, 2024]

NO. ITEM LT-6020D 1 CONTROL CYPCUT 2 LASER RESONATOR IPG 1500W 3 LASER HEAD RAYTOOLS 4 WATER CHILLER HANLI 5 SERVO MOTOR Yaskawa 6 CHUCK TYPE MECHANICAL SELF-CENTERING CHUCK AND PNEUMATIC ...
19822. 2023 Pneumatic Material Support Cutting Thickness Nc Swing Beam Hydraulic Shearing Machine ...
[Jul 09, 2024]

Products Description Main functions and features 1. The machine employs hydraulically-driven swing beam, the steel plate welded structure, and accumulator -based pullback cylinder with ...
19823. Arrival Modern Customized Prefab House Folding Container Homes
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19824. Modern Prefabricated Mobile Container Homes Office
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19825. Low Price Mobile Container House for Toilet
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19826. Advanced Good Installation Fabricated Container House Outdoor Container House
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19827. Popular High Quality Modular Prefab House Luxury House Prefabricated Homes
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19828. Magic House Container Homes Fast Install Modular Ready WPC Tiny House
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19829. Low Cost Purchase Prefabricated Detachable Container House Container House Structure
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
19830. Quick Installation Housing Units for Sale Habitable Container House
[Jul 02, 2024]

For Product: 1.How much manpower and time does it take to install the container? 2 hours + 4 workers=1 unit 2.What tools and equipment do I need to prepare for the installation of container? Crane, hand saw, ...
Company: Suzhou Dongji Integrated Housing Technology Co., Ltd.
